Mailing List & Search

 

 

Cape Fear River Basin Model

This Site is Still Under Construction

 

Search the Cape Fear River Basin Model Site

Search this site for information about the Cape Fear River Basin Model:

Tips for searching

Subscribe to the Mailing List

List #1 - Any Interested Party

If you would like to be included on the  mailing list to receive information relating to Cape Fear River Basin Model, there are two mailing list available. The first list is open for anyone to receive announcements about the model progress or to ask general questions.


To join (subscribe) this list:
   By email: [email protected]
   Over the web: http://dwr.ehnr.state.nc.us/scripts/lyris.pl?enter=capefearmodel

To read the postings to this list:
   Over the web: http://dwr.ehnr.state.nc.us/scripts/lyris.pl?enter=capefearmodel
   As a secure newsgroup: http://news.ncwater.org/capefearmodel

To leave (unsubscribe) this list:
   By email: [email protected]
   Over the web: http://dwr.ehnr.state.nc.us/scripts/lyris.pl?enter=capefearmodel

 

List #2 - Technical Committee Members/ Participating Agency Personnel

The second list  is for the Technical Committee. The technical committee is assisting with model development issues such as, modeling assumptions, data gathering, and testing. This list is open for anyone to read, but limited to the technical committee to post messages. If your not a member of the technical committee you can post your questions on the first list: http://dwr.ehnr.state.nc.us/scripts/lyris.pl?enter=capefear

To read postings to this list:
   Over the web: http://dwr.ehnr.state.nc.us/scripts/lyris.pl?enter=capefearmodel-techcomm
   As a secure newsgroup: http://news.ncwater.org/capefearmodel-techcomm
 

Home  |               Project Overview  |   Project History  |  Study Area                       Outline  | Task List         

Model Description  |  Model Requirements  | MIKE BASIN   |MIKE BASIN Features

Method Statements  |  Surface Water Withdrawals  |Surface Water Discharges  | Model Inputs

Staff & Consultants  |   Technical Review Committee  | Steering Committee  |  Upcoming Events  |   Schedule 

Archive  |   Search  Mailing List  |  Discussions   |  Links to Other Sites  |

ncdenr.gif (24067 bytes)               MNlogo.JPG (9164 bytes)           wpe29.gif (3446 bytes)

In Association With Our Funding Partners .. 

Cape Fear River Assembly

The Towns of Apex, Cary and Morrisville

Wake County.

For problems or questions regarding this web contact [[email protected]].
Last updated: May 11, 1999.