Davie Co

The Division of Water Resources (DWR) provides the data contained within this Local Water Supply Plan (LWSP) as a courtesy and service to our customers. DWR staff does not field verify data. Neither DWR, nor any other party involved in the preparation of this LWSP attests that the data is completely free of errors and omissions. Furthermore, data users are cautioned that LWSPs labeled PROVISIONAL have yet to be reviewed by DWR staff. Subsequent review may result in significant revision. Questions regarding the accuracy or limitations of usage of this data should be directed to the water system and/or DWR.

1. System Information

Contact Information

Complete

Water System Name: Davie Co   PWSID: 02-30-015
Mailing Address:298 East Depot St Suite 200
Mocksville, NC 27028
Ownership:County
 
Contact Person:Johnny LambertTitle:Director
Phone:336-753-6090Cell/Mobile:--
 
Secondary Contact:Michael Weir Phone:336-998-9763
Mailing Address:298 East Depot St Suite 200
Mocksville, NC 27028
Cell/Mobile:--
Distribution System
Line Type Size Range (Inches) Estimated % of lines
Asbestos Cement 4-12 7.00 %
Cast Iron 4-8 1.00 %
Ductile Iron 6-16 4.00 %
Polyvinyl Chloride 2-12 88.00 %
What are the estimated total miles of distribution system lines?   450 Miles
How many feet of distribution lines were replaced during 2024?   500 Feet
How many feet of new water mains were added during 2024?   45,000 Feet
How many meters were replaced in 2024?   3,000
How old are the oldest meters in this system?   16 Year(s)
How many meters for outdoor water use, such as irrigation, are not billed for sewer services?   1,046
What is this system's finished water storage capacity?   4.3340 Million Gallons
Has water pressure been inadequate in any part of the system since last update? Line breaks that were repaired quickly should not be included.   No
Programs
Does this system have a program to work or flush hydrants?   Yes, Annually
Does this system have a valve exercise program?   No
Does this system have a cross-connection program?   Yes
Does this system have a program to replace meters?   Yes
Does this system have a plumbing retrofit program?   No
Does this system have an active water conservation public education program?   Yes
Does this system have a leak detection program?   No
Water Conservation
What type of rate structure is used?   Flat/Fixed, Other
How much reclaimed water does this system use?   0.0000 MGD   For how many connections?   0
Does this system have an interconnection with another system capable of providing water in an emergency?   Yes

2. Water Use Information

Service Area
Sub-Basin(s)% of Service Population
Yadkin River (18-1)67 %
South Yadkin River (18-2)33 %
County(s)% of Service Population
Davie100 %
What was the year-round population served in 2024?   31,543
Has this system acquired another system since last report?   No
Water Use by Type
Type of Use Metered
Connections
Metered
Average Use (MGD)
Non-Metered
Connections
Non-Metered
Estimated Use (MGD)
Residential 12,132 2.0050 0 0.0000
Commercial 352 0.2160 0 0.0000
Industrial 17 0.0520 0 0.0000
Institutional 121 0.0690 0 0.0000

How much water was used for system processes (backwash, line cleaning, flushing, etc.)?   0.5800 MGD

Water Sales
Purchaser PWSID Average
Daily Sold
(MGD)
Days
Used
Contract Required to
comply with water
use restrictions?
Pipe Size(s)
(Inches)
Use
Type
MGD Expiration Recurring
Town of Mocksville 02-30-010 0.5290 5 0.0000 Yes Yes 6-12 Emergency

Town of Mocksville purchased water 5 days in 2024 for a total of 2,645,342 gallons.

3. Water Supply Sources

Monthly Withdrawals & Purchases
Average Daily
Use (MGD)
Max Day
Use (MGD)
Average Daily
Use (MGD)
Max Day
Use (MGD)
Average Daily
Use (MGD)
Max Day
Use (MGD)
Jan 3.2260 4.1800 May 3.2790 4.2590 Sep 3.5830 4.5480
Feb 2.9520 3.5510 Jun 3.9680 4.8810 Oct 3.6570 4.5930
Mar 2.8010 3.5360 Jul 3.9800 5.0470 Nov 3.1980 4.0660
Apr 3.0060 4.2160 Aug 3.7600 4.5660 Dec 2.8970 3.3340

Surface Water Sources
Stream Reservoir Average Daily Withdrawal Maximum Day
Withdrawal (MGD)
Available Raw
Water Supply
Usable On-Stream
Raw Water Supply
Storage (MG)
MGD Days Used MGD * Qualifier
S. Yadkin 1.6040 365 2.3510 10.1000 F 0.0000
Yadkin 1.7550 365 2.8460 63.4000 F 15.0000

* Qualifier: C=Contract Amount, SY20=20-year Safe Yield, SY50=50-year Safe Yield, F=20% of 7Q10 or other instream flow requirement, CUA=Capacity Use Area Permit

Surface Water Sources (continued)
Stream Reservoir Drainage Area
(sq mi)
Metered? Sub-Basin County Year
Offline
Use
Type
S. Yadkin 564 Yes South Yadkin River (18-2) Davie Regular
Yadkin 1,935 Yes Yadkin River (18-1) Davie Regular
What is this system's off-stream raw water supply storage capacity?   15 Million gallons
Are surface water sources monitored?   Yes, As Needed
Are you required to maintain minimum flows downstream of its intake or dam?   No
Does this system anticipate transferring surface water between river basins?   No
Water Purchases From Other Systems
Seller PWSID Average
Daily Purchased
(MGD)
Days
Used
Contract Required to
comply with water
use restrictions?
Pipe Size(s)
(Inches)
Use
Type
MGD Expiration Recurring
Town of Mocksville 02-30-010 0.2630 3 0.0000 Yes Yes 6-12 Emergency

Davie County purchased water from the Town of Mocksville 3 days for a total of 790,321 gallons.

Water Treatment Plants
Plant Name Permitted Capacity
(MGD)
Is Raw Water Metered? Is Finished Water Ouput Metered? Source
Cooleemee WTP 2.6000 Yes No South Yadkin
Sparks Road WTP 3.0000 Yes Yes Yadkin River
Did average daily water production exceed 80% of approved plant capacity for five consecutive days during 2024?  No
     If yes, was any water conservation implemented?  
Did average daily water production exceed 90% of approved plant capacity for five consecutive days during 2024?  No
     If yes, was any water conservation implemented?  
Are peak day demands expected to exceed the water treatment plant capacity in the next 10 years?  No

At time of submission of the 2024 LWSP, Davie County is at 65% final completion of the new 3.5 MGD Cooleemee WTP. Completion is currently on track for Spring 2026.

4. Wastewater Information

Monthly Discharges
Average Daily
Discharge (MGD)
Average Daily
Discharge (MGD)
Average Daily
Discharge (MGD)
Jan 1.9960 May 1.4210 Sep 1.5460
Feb 1.3540 Jun 1.2000 Oct 1.2370
Mar 1.4160 Jul 1.3590 Nov 1.1520
Apr 1.1960 Aug 1.4860 Dec 1.1860

How many sewer connections does this system have?   2,480
How many water service connections with septic systems does this system have?   8,000
Are there plans to build or expand wastewater treatment facilities in the next 10 years?   No
Wastewater Permits
Permit Number Type Permitted Capacity
(MGD)
Design Capacity
(MGD)
Average Annual
Daily Discharge
(MGD)
Maximum Day Discharge
(MGD)
Receiving Stream Receiving Basin
NC0024872 WWTP 1.5000 3.0000 0.5810 4.0000 South Yadkin South Yadkin River (18-2)
NC0084212 WTP 0.0000 0.4240 0.2880 0.9300 Yadkin River Yadkin River (18-1)
Wastewater Interconnections
Water System PWSID Type Average Daily Amount Contract
Maximum (MGD)
MGD Days Used
Winston Salem 02-34-010 Discharging 0.5090 365 5.0000
Mocksville 02-30-010 Receiving 0.2740 365 0.7500

5. Planning

Projections
  2024 2030 2040 2050 2060 2070
Year-Round Population 31,543 37,736 44,796 52,952 62,361 72,431
Seasonal Population 0 0 0 0 0 0
 
Residential 2.0050 2.5394 3.0145 3.5633 4.1965 4.8742
Commercial 0.2160 0.2400 0.2700 0.3100 0.3500 0.3700
Industrial 0.0520 0.2050 0.2360 0.2710 0.3120 0.3450
Institutional 0.0690 0.0820 0.0940 0.1080 0.1250 0.1550
System Process 0.5800 0.6000 0.6200 0.6500 0.6800 0.7000
Unaccounted-for 0.4228 0.9227 1.0152 1.1247 1.2486 1.3751
Future Water Sales
Purchaser PWSID Contract Pipe Size(s) (Inches) Use Type
MGD Year Begin Year End
Town of Mocksville 02-30-010 2.0000 2026 12 Regular

At time of completing 2024 LWSP, Davie County and the Town of Mocksville are still committed to the regionalization of utilities. The new Cooleemee WTP is about 67% complete and currently on schedule. Upon completion of construction of the new Cooleemee WTP, the Town of Mocksville will become a purchased water system decommissioning their Hugh Lagle WTP.

Future Supply Sources
Source Name PWSID Source Type Additional Supply Year Online Year Offline Type
South Yadkin River 02-30-015 Surface 0.0000 2026 Regular

Replacing the existing 2.6 MGD capacity Cooleemee WTP with the newly constructed 3.5 MGD capacity Cooleemee WTP. Construction has started and project is currently 67% complete during the time of submitting the 2024 LWSP.

Demand v/s Percent of Supply
  2024 2030 2040 2050 2060 2070
Surface Water Supply 73.5000 73.5000 73.5000 73.5000 73.5000 73.5000
Ground Water Supply 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Purchases 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Future Supplies 0.0000 0.0000 0.0000 0.0000 0.0000
Total Available Supply (MGD) 73.5000 73.5000 73.5000 73.5000 73.5000 73.5000
Service Area Demand 3.3448 4.5891 5.2497 6.0270 6.9121 7.8193
Sales 0.0072 0.0000 0.0000 0.0000 0.0000 0.0000
Future Sales 2.0000 2.0000 2.0000 2.0000 2.0000
Total Demand (MGD) 3.3520 6.5891 7.2497 8.0270 8.9121 9.8193
Demand as Percent of Supply 5% 9% 10% 11% 12% 13%

The purpose of the above chart is to show a general indication of how the long-term per capita water demand changes over time. The per capita water demand may actually be different than indicated due to seasonal populations and the accuracy of data submitted. Water systems that have calculated long-term per capita water demand based on a methodology that produces different results may submit their information in the notes field.

Your long-term water demand is 64 gallons per capita per day. What demand management practices do you plan to implement to reduce the per capita water demand (i.e. conduct regular water audits, implement a plumbing retrofit program, employ practices such as rainwater harvesting or reclaimed water)? If these practices are covered elsewhere in your plan, indicate where the practices are discussed here.    No Changes

Are there other demand management practices you will implement to reduce your future supply needs?   

What supplies other than the ones listed in future supplies are being considered to meet your future supply needs?   

How does the water system intend to implement the demand management and supply planning components above?   

Additional Information

Has this system participated in regional water supply or water use planning?  No

What major water supply reports or studies were used for planning?  

Please describe any other needs or issues regarding your water supply sources, any water system deficiencies or needed improvements (storage, treatment, etc.) or your ability to meet present and future water needs. Include both quantity and quality considerations, as well as financial, technical, managerial, permitting, and compliance issues:   

The Division of Water Resources (DWR) provides the data contained within this Local Water Supply Plan (LWSP) as a courtesy and service to our customers. DWR staff does not field verify data. Neither DWR, nor any other party involved in the preparation of this LWSP attests that the data is completely free of errors and omissions. Furthermore, data users are cautioned that LWSPs labeled PROVISIONAL have yet to be reviewed by DWR staff. Subsequent review may result in significant revision. Questions regarding the accuracy or limitations of usage of this data should be directed to the water system and/or DWR.