Carolina Beach

The Division of Water Resources (DWR) provides the data contained within this Local Water Supply Plan (LWSP) as a courtesy and service to our customers. DWR staff does not field verify data. Neither DWR, nor any other party involved in the preparation of this LWSP attests that the data is completely free of errors and omissions. Furthermore, data users are cautioned that LWSPs labeled PROVISIONAL have yet to be reviewed by DWR staff. Subsequent review may result in significant revision. Questions regarding the accuracy or limitations of usage of this data should be directed to the water system and/or DWR.

1. System Information

Contact Information

Incomplete

Water System Name: Carolina Beach   PWSID: 04-65-015
Mailing Address:1121 N Lake Park Blvd
Carolina Beach, NC 28428
Ownership:Municipality
 
Contact Person:Shawn ThomasTitle:Chief Water Plant Operator
Phone:910-782-9491Cell/Mobile:--
Distribution System
Line Type Size Range (Inches) Estimated % of lines
Cast Iron 6-12" 14.00 %
Ductile Iron 6-12" 14.00 %
Galvanized Iron 2" 10.00 %
Polyvinyl Chloride 2-12" 62.00 %
What are the estimated total miles of distribution system lines?   57 Miles
How many feet of distribution lines were replaced during 2002?   0 Feet
How many feet of new water mains were added during 2002?   3,000 Feet
How many meters were replaced in 2002?   200
How old are the oldest meters in this system?   10 Year(s)
How many meters for outdoor water use, such as irrigation, are not billed for sewer services?   0
What is this system's finished water storage capacity?   2.5000 Million Gallons
Has water pressure been inadequate in any part of the system since last update? Line breaks that were repaired quickly should not be included.   No
Programs
Does this system have a program to work or flush hydrants?   Yes, 2-6 Months
Does this system have a valve exercise program?   No, None
Does this system have a cross-connection program?   Yes
Does this system have a program to replace meters?   Yes
Does this system have a plumbing retrofit program?   Yes
Does this system have an active water conservation public education program?   Yes
Does this system have a leak detection program?   No
Water Conservation
What type of rate structure is used?   Flat
How much reclaimed water does this system use?   0.0300 MGD   For how many connections?   1
Does this system have an interconnection with another system capable of providing water in an emergency?   No

2. Water Use Information

Service Area
Sub-Basin(s)% of Service Population
Cape Fear River (02-3)0 %
New River (02-6)0 %
County(s)% of Service Population
New Hanover0 %
What was the year-round population served in 2002?   4,800
What was the seasonal population and months served in 2002? (if applicable)   22,000 ( May Jun Jul Aug Sep )
Has this system acquired another system since last report?   
Water Use by Type
Type of Use Metered
Connections
Metered
Average Use (MGD)
Non-Metered
Connections
Non-Metered
Estimated Use (MGD)
Residential 2,807 0.6050 0 0.0000
Commercial 89 0.0240 0 0.0000
Industrial 0 0.0000 0 0.0000
Institutional 2 0.0010 0 0.0000

How much water was used for system processes (backwash, line cleaning, flushing, etc.)?   0.0000 MGD

The Town will be working to identify and reduce unaccounted-for water use.

3. Water Supply Sources

Monthly Withdrawals & Purchases
Average Daily
Use (MGD)
Max Day
Use (MGD)
Average Daily
Use (MGD)
Max Day
Use (MGD)
Average Daily
Use (MGD)
Max Day
Use (MGD)
Jan 0.6790 0.9170 May 1.0610 1.5510 Sep 0.8840 1.1600
Feb 0.6550 0.7760 Jun 1.1810 1.4770 Oct 0.7890 1.1390
Mar 0.7570 1.0010 Jul 1.2620 1.8440 Nov 0.6950 0.8570
Apr 0.9160 1.3580 Aug 1.0880 1.3850 Dec 0.6700 0.8950

Ground Water Sources
Name or Number Average Daily Withdrawal (MGD) Max Day Withdrawal (MGD) 12-Hour Supply
(MGD)
CUA Reduction Year Offline Use Type
MGD Days Used
1 0.0440 365 0.216 0.1080 Regular
10 0.0960 365 0.288 0.1440 Regular
11 0.0850 365 0.216 0.1080 Regular
12 0.0600 365 0.230 0.1150 Regular
13 0.0780 365 0.360 0.1800 Regular
2 0.1330 365 0.216 0.1080 Regular
3 0.0810 365 0.216 0.1080 Regular
4 0.0000 0 0.000 0.0000 Emergency
5 0.0350 365 0.216 0.1080 Regular
6 0.1020 365 0.115 0.0580 Regular
7 0.0700 365 0.216 0.1080 Regular
8 0.0520 365 0.432 0.2160 Regular
9 0.0560 365 0.216 0.1080 Regular
Ground Water Sources (continued)
Name or Number Well Depth (Feet) Casing Depth
(Feet)
Screen Depth (Feet) Well Diameter (Inches) Pump Intake Depth (Feet) Metered?
Top Bottom
1 195 122 0 0 8 0 Yes
10 200 160 160 200 8 0 Yes
11 220 165 155 195 6 0 Yes
12 170 115 115 165 10 0 Yes
13 170 114 115 165 10 0 Yes
2 185 125 0 0 8 0 Yes
3 203 163 133 143 8 0 Yes
4 160 112 0 0 8 0 Yes
5 201 96 0 0 8 0 Yes
6 191 135 0 0 6 0 Yes
7 200 126 126 137 8 0 Yes
8 200 193 135 160 8 0 Yes
9 212 210 162 202 8 0 Yes
Are ground water levels monitored?   Yes, Monthly
Does this system have a wellhead protection program?   Yes

Well #4 has been physically disconnected from the system, but can be reconnected if needed.

4. Wastewater Information

Monthly Discharges
Average Daily
Discharge (MGD)
Average Daily
Discharge (MGD)
Average Daily
Discharge (MGD)
Jan 1.1490 May 1.4410 Sep 1.8300
Feb 1.2100 Jun 1.7340 Oct 1.8400
Mar 1.6420 Jul 1.9800 Nov 1.2830
Apr 1.5090 Aug 1.7170 Dec 1.1060

How many sewer connections does this system have?   3,411
How many water service connections with septic systems does this system have?   0
Are there plans to build or expand wastewater treatment facilities in the next 10 years?   Yes
Wastewater Permits
Permit Number Type Permitted Capacity
(MGD)
Design Capacity
(MGD)
Average Annual
Daily Discharge
(MGD)
Maximum Day Discharge
(MGD)
Receiving Stream Receiving Basin
NC0023256 3.0000 3.0000 1.4950 2.3860 Cape Fear River Cape Fear River (02-3)
WQ0019336 0.0300 0.0300 0.0000 0.0000 Spray Field Cape Fear River (02-3)

Permit #WQ0019336 spray irrigation; started Nov. 2002

Wastewater Interconnections
Water System PWSID Type Average Daily Amount Contract
Maximum (MGD)
MGD Days Used
Kure Beach 04-65-025 Receiving 0.3880 365 0.7500

5. Planning

Projections
  2002 2010 2020 2030
Year-Round Population 4,800 5,500 6,200 6,900
Seasonal Population 22,000 25,000 30,000 34,000
 
Residential 0.6050 0.9730 1.1670 1.3230
Commercial 0.0240 0.0390 0.0460 0.0520
Industrial 0.0000 0.0000 0.0000 0.0000
Institutional 0.0010 0.0020 0.0020 0.0020
System Process 0.0000 0.0000 0.0000 0.0000
Unaccounted-for 0.2620 0.4210 0.5050 0.5730

Projected service area demand (2010-2050) is for a maximum summer month based on seasonal population.

Future Supply Sources
Source Name PWSID Source Type Additional Supply Year Online Year Offline Type
Filter Plant for wells 12,13, 14, 04-65-015 Ground 0.0000 2003 Regular
Well 14 04-65-015 Ground 0.3100 2003 Regular

Wells 12, 13, and 14 will feed into the new Alabama
Filter Plant.

Demand v/s Percent of Supply
  2002 2010 2020 2030
Surface Water Supply 0.0000 0.0000 0.0000 0.0000
Ground Water Supply 1.4690 1.4690 1.4690 1.4690
Purchases 0.0000 0.0000 0.0000 0.0000
Future Supplies 0.3100 0.3100 0.3100
Total Available Supply (MGD) 1.4690 1.7790 1.7790 1.7790
Service Area Demand 0.8920 1.4350 1.7200 1.9500
Sales 0.0000 0.0000 0.0000 0.0000
Future Sales 0.0000 0.0000 0.0000
Total Demand (MGD) 0.8920 1.4350 1.7200 1.9500
Demand as Percent of Supply 61% 81% 97% 110%

The purpose of the above chart is to show a general indication of how the long-term per capita water demand changes over time. The per capita water demand may actually be different than indicated due to seasonal populations and the accuracy of data submitted. Water systems that have calculated long-term per capita water demand based on a methodology that produces different results may submit their information in the notes field.

Your long-term water demand is 126 gallons per capita per day. What demand management practices do you plan to implement to reduce the per capita water demand (i.e. conduct regular water audits, implement a plumbing retrofit program, employ practices such as rainwater harvesting or reclaimed water)? If these practices are covered elsewhere in your plan, indicate where the practices are discussed here.    

Are there other demand management practices you will implement to reduce your future supply needs?   

What supplies other than the ones listed in future supplies are being considered to meet your future supply needs?   

How does the water system intend to implement the demand management and supply planning components above?   

Projected service area demand (2010-2050) is for a maximum summer month based on seasonal population.

Additional Information

Has this system participated in regional water supply or water use planning?  No

What major water supply reports or studies were used for planning?  

Please describe any other needs or issues regarding your water supply sources, any water system deficiencies or needed improvements (storage, treatment, etc.) or your ability to meet present and future water needs. Include both quantity and quality considerations, as well as financial, technical, managerial, permitting, and compliance issues:   Interconnections with neighboring water systems for emergency supply will be considered. The Town needs to complete a water audit of the service area to identify and reduce the amount of unaccounted-for water use before the next plan update.

The Division of Water Resources (DWR) provides the data contained within this Local Water Supply Plan (LWSP) as a courtesy and service to our customers. DWR staff does not field verify data. Neither DWR, nor any other party involved in the preparation of this LWSP attests that the data is completely free of errors and omissions. Furthermore, data users are cautioned that LWSPs labeled PROVISIONAL have yet to be reviewed by DWR staff. Subsequent review may result in significant revision. Questions regarding the accuracy or limitations of usage of this data should be directed to the water system and/or DWR.