2018 Annual Water Use Report
Section 1: Facility Information
Registrant: |
Nucor Corporation |
Facility ID: |
0720-0001 |
Facility Name: |
Nucor Steel |
Facility Type: |
Industrial |
County: |
Hertford |
Sub-Basin: |
Chowan River (04-1) |
Mailing Address: |
1505 River Rd. Cofield, NC 27922 |
Email: |
[email protected] |
Contact Person: |
Bill Vaughan |
Title: |
Environmental Manager |
Phone: |
252-356-3707 |
Fax: |
-- |
Section 2: Withdrawal Information
2-A. Average daily withdrawal and maximum day withdrawal by month in million gallons per day (MGD)
Month |
# of Days Used |
Average Daily Withdrawal (MGD) |
Maximum Day Withdrawal (MGD) |
Month |
# of Days Used |
Average Daily Withdrawal (MGD) |
Maximum Day Withdrawal (MGD) |
Jan |
31 |
.701918 |
1.055851 |
Jul |
31 |
.824617 |
1.128134 |
Feb |
28 |
.687280 |
1.288124 |
Aug |
31 |
.786139 |
.945810 |
Mar |
31 |
.634480 |
1.083160 |
Sep |
30 |
.676367 |
1.086120 |
Apr |
30 |
.670074 |
.989688 |
Oct |
31 |
.642009 |
1.335175 |
May |
31 |
.902160 |
1.514031 |
Nov |
30 |
.654269 |
1.283495 |
Jun |
30 |
.896312 |
1.211616 |
Dec |
31 |
.469157 |
.769258 |
2-B. Source Information - Please complete one row for each water withdrawal source. If any of your source information was imported from a previous year, please make sure you click edit and fill in the information left blank that is needed for the 2018 reporting year.
Source Name |
Source Type |
Average Daily |
Days Used |
Pumping Capacity (MGD) |
WW8 |
Well |
.164335 |
253 |
0.443 |
WW7 |
Well |
.030886 |
363 |
0.432 |
WW5 |
Well |
.283127 |
358 |
0.432 |
WW4 |
Well |
.247764 |
322 |
0.432 |
WW3 |
Well |
.011257 |
365 |
0.432 |
WW2 |
Well |
.055713 |
241 |
0.432 |
WW1 |
Well |
.024971 |
292 |
0.432 |
DW2 |
Well |
.008902 |
365 |
0.060 |
DW1 |
Well |
.017347 |
365 |
0.060 |
Fire Pump |
Pond |
.00036 |
49 |
0.288 |
Chowan River Basin |
River |
.128419 |
11 |
2.44 |
Section 3: Discharge Information
3-A. Average daily discharge and maximum day discharge by month in million gallons per day (MGD)
Month |
# of Days Discharged |
Average Daily Discharge (MGD) |
Maximum Day Discharge (MGD) |
Month |
# of Days Discharged |
Average Daily Discharge (MGD) |
Maximum Day Discharge (MGD) |
Jan |
|
|
|
Jul |
|
|
|
Feb |
|
|
|
Aug |
|
|
|
Mar |
|
|
|
Sep |
|
|
|
Apr |
|
|
|
Oct |
|
|
|
May |
|
|
|
Nov |
|
|
|
Jun |
|
|
|
Dec |
|
|
|
3-B. Please complete one row for each discharge method. If any of your discharge information was imported from a previous year, please make sure you click edit and fill in the information left blank that is needed for the 2018 reporting year.
Identifier or Permit Number |
Discharge Type |
Average Daily |
Days Discharged |
Discharge Capacity |
No Discharges Listed. |
Section 4: Sub-Basin Transfer Information
Complete this section only if you withdraw or purchase water that is not returned to the sub-basin from which it was withdrawn.
4-A. Please complete one row for each transfer of surface water from one sub-basin to another. If any of your transfer information was imported from a previous year, please make sure you click edit and fill in the information left blank that is needed for the 2018 reporting year.
Description of Transfer |
Source Sub-Basin |
Receiving Sub-Basin |
Transfer Capacity |
No Transfers Listed. |
4-B. Enter the average daily and maximum day surface water transfer amount for each month in million gallons per day (MGD)
Month |
# of Days Transferred |
Average Daily Transfer (MGD) |
Maximum Day Transfer (MGD) |
Month |
# of Days Transferred |
Average Daily Transfer (MGD) |
Maximum Day Transfer (MGD) |
Jan |
|
|
|
Jul |
|
|
|
Feb |
|
|
|
Aug |
|
|
|
Mar |
|
|
|
Sep |
|
|
|
Apr |
|
|
|
Oct |
|
|
|
May |
|
|
|
Nov |
|
|
|
Jun |
|
|
|
Dec |
|
|
|
Do you have any comments?
March 29, 2019
Attn: John Barr
North Carolina Department of Environmental Quality
Division of Water Resources
512 North Salisbury Street
1611 Mail Service Center
Raleigh, North Carolina 27699-1611
RE: Nucor Steel – Hertford County Mill
Facility ID: 0720-0001
Modifications to Contact Person, Pumping Capacity, and Average Daily Withdraw
Dear Mr. Barr:
Nucor Steel Corporation – Hertford County Mill is submitting their Annual Water Use Report for Calendar Year 2018 (i.e., for the period of January 1 through December 31, 2018) as required by General Statute 143-215.22H. The following modifications have been incorporated into the Annual Water Use Report for Calendar Year 2018:
• Contact Person and Email from “Terry Hairston†at “[email protected]†to “Bill Vaughan†at “[email protected].â€Â
• Pumping Capacity (MGD) from “1.0†to “2.44†to accurately reflect the capacity of the cooling water system.
Should you have any questions with regard to the modifications addressed in this letter and within the Annual Water Use Report, please contact me at (252) 356-3707 or at [email protected].
Sincerely,
Bill M. Vaughan, II
Bill Vaughan
Environmental Manager
|