|
WelcomeThis site provides information about the Cape Fear River Basin Study. If you have visited here before, you may want to take a look at What's New first. Purpose of the StudyThe State of North Carolina does not have a tool to evaluate the basinwide impacts of either existing or proposed future water uses in the Cape Fear River Basin. The Division of Water Resources (DWR) and local stakeholders have commissioned a study to develop a hydrologic simulation model for the basin. The stakeholders include the counties and municipalities within the basin. The model will include the entire watershed from the headwaters down to Lock and Dam #1 near Wilmington. Below this point the Cape Fear is influenced by the tide from the Atlantic Ocean. The estuary below L&D #1 is outside the scope of the study. Planned Uses for the Model
What's NewThe following is a list of recent additions to our web. Whenever we publish the minutes for a meeting, write a description of an analytic procedure, submit a status report, or add anything else to the site, we'll put a notice here. The most recent changes are listed first, and each item is linked to the page with the updated content. 29 Mar 99
31 Dec 99
Back to Top
|
Home | Project Overview | Project History | Study Area Outline | Task List Model Description | Model Requirements | MIKE BASIN |MIKE BASIN Features Method Statements | Surface Water Withdrawals |Surface Water Discharges | Model Inputs Staff & Consultants | Technical Review Committee | Steering Committee | Upcoming Events | Schedule Archive | Search | Mailing List | Discussions | Links to Other Sites | In Association With Our Funding Partners .. Cape Fear River Assembly The Towns of Apex, Cary and Morrisville Wake County. For problems or questions regarding this web contact [capefear@hydrology.ehnr.state.nc.us].
|